SR 0041 Section VCB, PA 41 over Valley Creek, Chester County

Signal street timingThis project involved the expedited replacement of the bridge over Valley Creek and rehabilitation of the bridge over Officer’s Run in Parksburg Borough and West Fallowfield, Highland and West Sadsbury Townships, Chester County. The bridges, which are located just south of the Route 372 (Lower Valley Road) intersection and stand approximately 850 feet apart, are no longer classified as structurally deficient following the completion of construction.  The Route 41 (Gap Newport Pike) bridges carry an average of 13,412 vehicles per day, 27 percent of which are trucks. Dawood was responsible for the design of a new traffic signal at one intersection and retimed and upgraded four other signalized intersections along the detour route. The aggressive construction schedule allowed the team to completely rebuild both structurally deficient bridges in six weeks and reopen this critical highway for the thousands of motorists and commercial vehicles in Chester County.

• Traffic Engineering
• Traffic Signal Design
• Traffic Signal Timing Optimization
• Feasibility Studies