Antero Midstream Gathering & Water System

Dawood completed a project that included over 100,000 feet of high-pressure water lines as well as parallel low-pressure and high-pressure gas lines. Dawood established a field office and deployed more than a dozen survey crews, along with office support and design teams to assist in the completion of this project. The project serves multiple wells and ties into a MarkWest processing facility. Dawood’s GIS team assisted with the creation of an interactive US Department of Transportation (DOT) Job Books and alignment sheets to aid in the operations and maintenance of these assets. Over 150 miles of routing, ROW stakeout, and As-Built Survey for a midstream gathering system in Southeastern Ohio were also completed.

Share :

SERVICES :

  • Pigging Facility Design,
  • Pipeline Interchange Design / Testing,
  • Routing Hydrostatic Testing of Lines,
  • As-built surveys,
  • Field Survey,
  • Right-of-Way Staking,
  • DOT Job Books
Image
Image
Image
Image
Image
Image